Access Bridge, Don Mueang Terminal

Category:

Description

Project Name

Access Bridge, Don Mueang Terminal

Project Specification

  • Build-up I-girder steel curve beam (Elevated Bridge)
  • SG 1 > 27.4 m
  • SG 2 > 25.2 m
  • SG 3 > 23.0 m
  • SG 4 > 20.8 m
  • SG 5 > 18.55 m

Contract Amount

5.00 million THB

Project Duration

3 Months

Location

In front of Don Mueang Airport, Bangkok, Thailand.

Owner

DOH, Thailand